Tuesday, April 07, 2026
09/02, 09:02

“Windea Leibniz” is ready to boost offshore wind power expansion in the Baltic and North Sea

On 4 February 2023, BSM managed Service Operation Vessel (SOV) “Windea Leibniz” finished an extensive upgrade at Ulstein Shipyard in Norway. With an increase of cabins from 60 to over 80, the vessel has transitioned from an SOV to a Commissioning Service Operation Vessel (CSOV). Additionally, the ship received one extra pedestal on the stern for Baltic Sea operations to complement the existing pedestal for North Sea use. The upgrade expands the operational range of “Windea Leibniz” and makes her even more attractive for the offshore market.
The upgrade of “Windea Leibniz” was timed perfectly as European governments want to expand renewable energy capacities in the Baltic and North Sea. Last year the EU had a capacity of approximately 15 gigawatts (GW) in offshore wind power production. Germany alone is aiming to double their capacities by 2030. According to the German government, this equals an expansion of offshore wind energy to at least 30 GW by 2030, with at least 40 GW of installed capacity by 2035 and at least 70 GW by 2045.
Supporting the expansion of renewable energy sources
“Offshore wind is an essential part for the success and the transformation of the energy sector towards sustainable and green solutions. The upgrade makes ‘Windea Leibniz’ even more attractive for the market,” says Matthias Mueller, Managing Director of shipowner Bernhard Schulte Offshore.
“Windea Leibniz" is now ready to support the planned offshore wind power expansion in Northern Europe. The ultra-modern SOV was built in 2017 at Ulstein Shipyard for Bernhard Schulte Offshore to efficiently service offshore wind farms in the North Sea. The vessel functions as a reliable and environmentally sound platform for wind farm operations and maintenance support, technician accommodation and transport, and the provision of safe and reliable access to offshore installations.   
50% increase of accommodation capacities
The upgrade included a 50% increase of accommodation capacities on board. Therefore, extensive reconstruction measures including shifting of the changing/drying rooms, conference rooms and day rooms were executed. In total the cabin capacity was increased from 63 to 81 cabins. Now “Windea Leibniz” can accommodate up to 85 technical staff for wind farms, service personnel and crew.
The second major milestone was the installation of a new height-adjustable pedestal for the motion compensating gangway, making the vessel more flexible in offshore wind farms. Now the gangway can operate in a range between 17.5 metres and 23 metres height above waterline when fully extended.
More flexibility for deployment in different wind farm markets
The third milestone focussed on the installation of a second pedestal for the gangway at stern. It enables “Windea Leibniz” to also sail in offshore wind parks in the Baltic Sea where service platforms are generally lower located than in the North Sea.
Rainer Mueller, Captain on the “Windea Leibniz” says, "With the two new pedestals, we are more flexible when approaching the service platforms for the wind turbines. There is no uniform standard for the height of the platforms in North Sea wind farms. After the yard stay, we can now vary with the height of our gangway. With the Baltic pedestal at stern, we can easily switch our gangway from the North Sea height to the lower Baltic Sea height, which makes us even more flexible when working in different wind farm regions. The new cabins allow us to accommodate more technicians on board. All this really makes ‘Windea Leibniz’ the new it-girl on the CSOV market."
Technical Specification "Windea Leibniz"
Length: 88 m
Beam: 18 m
Dead weight: 3150 tonnes
Draught (max): 6.4 m
Speed (max): 13.5 kn
Accommodation: 85 POB
Deck area: 380 sqm
About Bernhard Schulte Shipmanagement
Bernhard Schulte Shipmanagement (BSM) is an integrated maritime solutions provider. Managing a fleet of over 650 vessels, more than 20,000 seafarers and 2,000 shore-based employees enable the delivery of safe, reliable and efficient ship management services through a network of 11 ship management centres, 25 crew service centres and four wholly owned maritime training centres across the world. Alongside comprehensive ship management services, BSM offers a suite of complementary maritime solutions that are customised to meet individual customer requirements. As a member of the Schulte Group, BSM benefits from its 140+ years of experience in the shipping industry.
www.bs-shipmanagement.com
About Bernhard Schulte Offshore
Bernhard Schulte Offshore (BS Offshore) is the offshore unit of the renowned international shipping organisation Schulte Group. The company is an asset provider to the offshore wind industry providing bespoke vessels to fulfil the requirements of its clients, based on long-term charters. In addition, part of the existing fleet of Tier-1 Service Operation Vessels (SOV) is available for short-term needs. BS Offshore is a pioneer in offshore wind and built the first SOV without steps in 2015, enabling technicians to take spare parts with them from below deck to the wind turbine via a motion compensated gangway by use of an electrical trolley.
www.bs-offshore.com

Image1: “Windea Leibniz” at Ulstein Shipyard in Norway. ©BSM/Matthias Giebichenstein
image2: Installation of the new height-adjustable pedestal with 32 tonnes of weight. ©BSM

ELNAVI Newsletter
More information: ELNAVI,
19, Aristidou str., Piraeus 185 31,
Tel.: +30 210 45.22.100, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Share